The first 3 days - Demolition time








The first 3 days were spent on the demolition of the big wooden box where the bathroom and children's room were situated. That "wooden box" is the only thing breaking the otherwise big open lofty space of 120 m2. We decided to tear the whole thing down as it will prove to be easier to rebuild the bathroom completely. The bathroom is going to be twice the size it was (with a bath tub, a big double sink and a luxurious sized walk in shower) but the improvised extra room has to go and will make way for an extra inbuild closet. The total size of that wooden box will be approximately the same as it was before.